Heartland Logistics Corp approached us to pour the structural foundation and slab for a new regional distribution center designed to support high-bay racking and automated material handling systems.
Our team engineered the slab and foundation design around the client’s specific equipment loads, running a coordinated continuous pour to eliminate the joint lines that would have interfered with automated systems later.


